Client’s Challenge​

Statnett required a refurbishment of an existing 300 kV Station.

Snow and Norwegian winter conditions presented challenges to the project programme.

Outage planning was a priority to minimise disruption and continuity of supply.​

Location

Norway

Voltage

300 kV

R

Completion Date

2019

Technical Information

 

  • As Principal Contractor, H&MV project managed the design and construction of the 300 kV station refurbishment, which included primary component replacement, a new building for the new control systems, cable ducting and OHL diversion works​
  • H&MV Engineering were responsible for safety & risk management throughout the project lifecycle and produced a complete set of civil and electrical as-built drawings and Safety Handover file​
  • A full 3D model was prepared for the station as part of the design process​