Garvagh 110 kV Turnkey Substation

Garvagh 110 kV Turnkey Substation

H&MV Engineering were appointed to deliver a full turnkey 110kV Gas Insulated Substation (GIS) for a wind farm connection. The connection offer was with EirGrid and the hand over was to asset owner ESB. The existing ‘tail fed’ Garvagh 110kV Substation (provided...